Shay Residence

Gas Fireplace is on site

New Tub has arrived and is installed

Stairs redone for open carriage

Hurricane Clips installed

4 stringers for added strength and stability, and they dont squeak

Cans are installed

Head Room Changes Per Structural Engineered Specs for Second floor stairs

Basement Insulation R-30 (Ceiling)

Services trench complete

Ist Floor Insulation R-19(walls)

AC ducting 2nd Floor

vapor barrier (6mil) installed

1" Conduit for HDTV

2nd Floor insulation (R-38 Ceilling)

Porch Windows

Blue Board on the Ceilings

Backwall Siding

Fireplace is moved back

Vinyl progress

pocket door framing

Pella Pro Line French Door has arrived

Plastering 2nd Floor

View from RT 137

Kitchen Cabinets

fireplace installled

Kitchen Cabinets

Electrical Panel

front porch siding

AC ducting complete

Inside of Porch

Carrier Air Conditioner